August 05, 2007

What next?

I think the drop-off into the berm could do with something special being added.
Namely an extension of the berm as far as the tree, the extension will be a combo of wood work and soil/rocks.
The extension would need to be higher than the existing berm as a lot of speed gets carried into the berm from the drop-off.

1 comment:

Oisin said...

There is another berm a bit after that section that I think also stops a bit short. Could could with a bit of extending too so you can keep the speed out of it.